Reconstruction and modernization of the sand preparation system, including the construction of a new building and a major investment in new equipment. The scope includes a sand cooler, two mixers with an integrated laboratory (each sand batch is quality-controlled), and a system for the regeneration of reclaimed sand. VIDEO
The facility is fully enclosed and environmentally friendly in terms of emissions and noise. More than 200 tons of technological equipment have been installed inside the building.
SIAPRO provided engineering, mechanical design, PLC programming, equipment supply and installation, with integrated equipment from Simpson Technologies Corporation.